High Voltage Cables in Power Plants
- 400kV HV oil filled cables-net installation at Al-Qadisiya Hydro Power Plant, Al-Anbar County west of Iraq.
- 36kM of 132kV XLPE- HV cables-net were installed east of Basrah County south of Iraq to link two Power plants and sub-stations.
- 400kV XLPE- HV cables-net installation in Al-Qudus GTPP North of Baghdad-Iraq.
- 132kV XLPE- HV cables-net installation in Al-Taji /2 GTPP. North-west of Baghdad-Iraq.
- Joint work with Suedkable Co.–Siemens group in the installation of 400kV XLPE-HV in Jammo-Kashmeer-India Hydro power station.
- Laying, installation, testing and termination of 132/400 kV XLPE-HV cables at Al Mansouriya Power Plant
- Project. The client for this project was Alstom Grid.
- Supervision for cables laying, termination and testing of 132/400 kV XLPE-HV cables at Khairat Power Plant
- Project. The client for this project was Calik Energy.
- Supervision for cables laying and testing of XLPE-A I 132kV cables at Mosul 400/132/11kV GIS substation.
- The client for this project was Alstom Grid.