High Voltage Cables in Power Plants

  • 400kV HV oil filled cables-net installation at Al-Qadisiya Hydro Power Plant, Al-Anbar County west of Iraq.
  • 36kM of 132kV XLPE- HV cables-net were installed east of Basrah County south of Iraq to link two Power plants and sub-stations.
  • 400kV XLPE- HV cables-net installation in Al-Qudus GTPP North of Baghdad-Iraq.
  • 132kV XLPE- HV cables-net installation in Al-Taji /2 GTPP. North-west of Baghdad-Iraq.
  • Joint work with Suedkable Co.–Siemens group in the installation of 400kV XLPE-HV in Jammo-Kashmeer-India Hydro power station.
  • Laying, installation, testing and termination of 132/400 kV XLPE-HV cables at Al Mansouriya Power Plant
  • Project. The client for this project was Alstom Grid.
  • Supervision for cables laying, termination and testing of 132/400 kV XLPE-HV cables at Khairat Power Plant
  • Project. The client for this project was Calik Energy.
  • Supervision for cables laying and testing of XLPE-A I 132kV cables at Mosul 400/132/11kV GIS substation.
  • The client for this project was Alstom Grid.